Check a complete building energy boundary
See this course’s project requirements
A fictional building-energy brief with source/unit checks, whole-year site energy, floor-area intensity, fair comparison limits, anomaly questions and an evidence-based monitoring proposal.
Keep your working files in your own notebook or software. Save a private description, checklist, and work link in My Proof.
What to include
- Save audited annual energy inventory and excluded-meter list; include the original-case decision evidence and a separate changed-case result.
- Save fuel-specific conversion ledger and site total; include the original-case decision evidence and a separate changed-case result.
- Save site EUI with boundary/period/no score label; include the original-case decision evidence and a separate changed-case result.
- Save bounded building comparison and needed peer data; include the original-case decision evidence and a separate changed-case result.
- Save source/site scenario comparison with factor limitations; include the original-case decision evidence and a separate changed-case result.
- Save building energy inventory/conversion/EUI/source/comparison brief; include the original-case decision evidence and a separate changed-case result.
Review and revise
Use these criteria to check your work and choose what to improve.
- The final packet uses the supplied task-specific constraints and all six records agree.
- Every result can be traced to an identifier, input, calculation or stated decision rule.
- Changed-case practice updates dependent records and keeps holds or uncertainty visible.
- The packet states the learner role, authority boundary and specific next verification needed before real work.
Want more background?
The idea in everyday life
Original fictional workplace practice; paper or a local document is sufficient. The rules and records below are supplied for this exercise, not asserted universal workplace policy. Fictional Aspen A20,000 ft²gross floor area. Four quarterly totals cover 12 months:Q1 electric 50,000 kWh /gas 2,000 therm; Q245,000/1,000; Q360,000/800; Q445,000/2,200. One exact duplicate Q2 row also appears. Other meters outside A excluded.
An energy benchmark requires matching period, building boundary, units and floor area; duplications or gaps can make a neat number misleading.
Check a complete building energy boundary — worked practice
An energy benchmark requires matching period, building boundary, units and floor area; duplications or gaps can make a neat number misleading.
Fictional Aspen A20,000 ft²gross floor area. Four quarterly totals cover 12 months:Q1 electric 50,000 kWh /gas 2,000 therm; Q245,000/1,000; Q360,000/800; Q445,000/2,200. One exact duplicate Q2 row also appears. Other meters outside A excluded. Use paper or a local document. Preserve the original case and make a separate changed-case record.
1. Step 1
Define A,12-month period and gross floor area boundary.
You should see: A only,20,000 ft², all four quarters.
Keep the stated identifier, unit and policy alongside this result so another reader can check it.
2. Step 2
Identify duplicate Q2 without discarding a legitimate quarter.
You should see: Five input rows represent four unique quarters.
Keep the stated identifier, unit and policy alongside this result so another reader can check it.
3. Step 3
Add unique source quantities by unit.
You should see: Electric 200,000 kWh ; gas 6,000 therm.
Keep the stated identifier, unit and policy alongside this result so another reader can check it.
4. Step 4
Save audited annual energy inventory and excluded-meter list.
You should see: Do not add unlike units or outside building energy.
Keep the stated identifier, unit and policy alongside this result so another reader can check it.
What to finish
Save audited annual energy inventory and excluded-meter list; include the original-case decision evidence and a separate changed-case result.
Watch for this
Combining raw unlike units or removing a missing quarter to claim a complete annual inventory.
How can I tell I understand it?
Using the supplied identifiers, I can save audited annual energy inventory and excluded-meter list. My changed-case record names the revised condition and explains which dependent decision it changes.
Quick knowledge check
Answer all 3 questions. Get at least 2 right and the lesson completes automatically.
You’ll get an explanation for each answer. Signed in? Your results save to your account.
Pass the check. We’ll save the progress.
Answer all 3 questions above and get at least 2 right. You can review the explanations and try again.
Go to the knowledge checkTools, templates, and lesson sources
Tools and templates
Tools open in a new tab so you can keep your place here.
Sources and further reading
Explore the references behind this lesson.
Source & access notes · checked 2026-10-01
Public agency or educational context; no source exercises are copied and no simulated threshold is presented as an official rule. Page title and relevant content inspected; no interactive controls or credential process tested.
Access: Readable official page retrieved with the web reader on 2026-10-01.
Reuse: All teaching cases, data, worked steps and questions are original. Link and limited paraphrase for context; no copied source exercises.
Source & access notes · checked 2026-10-01
Public agency or educational context; no source exercises are copied and no simulated threshold is presented as an official rule. Page title and relevant content inspected; no interactive controls or credential process tested.
Access: Readable official page retrieved with the web reader on 2026-10-01.
Reuse: All teaching cases, data, worked steps and questions are original. Link and limited paraphrase for context; no copied source exercises.
Source & access notes · checked 2026-10-01
Occupational task and responsibility context; the exercise policies and quantities are original fictional inputs. Page title and relevant content inspected; no interactive controls or credential process tested.
Access: Readable official page retrieved with the web reader on 2026-10-01.
Reuse: All teaching cases, data, worked steps and questions are original. Link and limited paraphrase for context; no copied source exercises.
Report a problem with this lesson
Tell us what went wrong. Please leave out personal information and private project contents.